Pay attention! Children indoor playground project planning beware of these four mistakes.

2023-05-12 5 min read Contributor: Li Guohua
wps4

Indoor playground  is becoming more and more welcomed and loved by children, the endless market prospect is attracting many investors to participate in. To open an indoor playground or trampoline park, investors need to master a lot of tricks, indoor playground project planning mistakes are also many. Today 2kiddy here want to show you some common project planning mistakes and how to overcome them and become successful.

Mistake 1: Subjective assumption

When investors in the selection of projects, there is a common mistake: when find a novel project, experience, feel good, immediately make a purchase decision. However, the project was put into operation, but could not reach the expected effect. So when selecting projects, investors should not only rely on subjective assumptions, but also consider a series of issues such as the surrounding crowd, the local consumption level, playing habits, etc. Only by selecting suitable  playground equipment  in their own place can they achieve the maximum benefit.

wps5

Mistake 2: Grasp all, lose all

Some playgrounds have a large area, but only few projects, giving people a feeling of very empty, The player will easy to loose interests, not conducive to long-term development. And some playgrounds are small, but there are a lot of equipment, very crowded, let the players feel uncomfortable.

When planning projects in indoor playground, we must choose appropriate and reasonable projects according to the size and shape of the place. In the selection of projects, we should avoid "Grasp all, lose all". A large number of projects or all projects is not necessarily merit, but the right way is to adapt to local conditions.

Mistake 3: the theme is not clear

Many playground in the name of "children's theme park", but the practice in the planning of the project, they copy this playground some tips, copy that playground some tips, what is more, even the decoration and machine placement are "brought", the final playground became a "strange look", not to mention the "theme" two words. How to do the primary and secondary clear, highlight the theme of the playground? On the one hand, we can make some efforts in the decoration of the place, decoration equipment. On the other hand, in the planning, promotion, implementation and activities of the park, surrounded with the playground theme, by and by, it constitutes the unique civilization and label of own playground.

wps6_副本

Mistake 4: hot and cold projects layout is unreasonable

Relatively speaking, if there are "hot" projects in the site, there must be "cold" projects. In the playgrounds, some areas are popular, and some areas are unattended, which is not conducive to the operation of the whole playground. The hot and cold projects in the site must be reasonably crossed, there are cold projects between the hot projects, there are hot projects between the cold projects, through the hot projects to move cold projects, hot and cold projects throughout the whole field, constitute a sound closed loop, so as to add consumers in your playground to stay time.


Share

President of yaen Import and Export Materials Manufacturer | 25 Years' Industrial fabrics manufacturer, professional production team, strict online and offline inspection method, makes DER products well distributed to more than 100 countries all over the world.

More on this

XingJian Play Toys

Home
Products
WhatsApp
Contact

Back To The Top

+86-13968951980

Get in touch
Looking for support or a quote? We are here for you! Please fill out the form below and we will get back to you as soon as possible!
*
*
*
*
*
Fields marked with * are required